Fairview Terminals Phase 2 North

Location: Prince Rupert, BC

Owner: DP World Prince Rupert

Completed: 2017

Value: $180M

In 2015, two GIG partner companies FRPD and BEL formed a Joint Venture to complete the next phase of this extremely challenging project. GIG’s third partner company, Kingston, was a key sub-contractor on the project.

South Fraser Perimeter Road

Location: Surrey, BC
Owner: Province of British Columbia
Completed: 2014
Value: $700M

The South Fraser Perimeter Road Project is a new four-lane, 35km route along the south side of the Fraser River extending from Deltaport Way in Southwest Delta to the Golden Ears Bridge connector road in Surrey/Langley.

Lynn Creek Bridge & Brooksbank Ave Underpass

Location: North Vancouver, BC
Owner: Port Metro Vancouver
Completed: January 2012
Value: $16.3M

As part of improvements to rail capacity in the North Shore trade area, six track widening of the existing railway bridge over Lynn Creek and the existing rail/road grade separation at Brooksbank Avenue was required. 

Port Mann Highway 1 Fraser Heights Wetlands Bridge

Location: Surrey, BC 
Owner: Kiewit Flatiron GP
Completed: June 2012
Value: $17M

The Fraser Heights Wetlands Viaduct is an integral component of the new South Fraser Perimeter Road and Port Mann Highway 1 projects which connect Deltaport to the Golden Ears Bridge and Highway 1 corridor.

Port Mann Highway 1 Improvement

Location: Vancouver to Langley, BC 
Owner: Kiewit Flatiron GP
Completed: June   2012
Value: $20M

Since the beginning of construction in 2009, GIG was involved as a preferred subcontractor to the Kiewit Flatiron GP (KFGP) Design-Build team, for the replacement of the original Port Mann Bridge and upgrading of 37km of Highway 1 from Vancouver to Langley.

Center Terminal Redevelopment Phase 2

Location: Vancouver, BC
Owner: DP World Prince Rupert
Completed: 2006
Value: $45M

GIG partner companies, FRPD and BEL Contracting participated in the reconstruction of the Centerm Terminal on the South side of Burrard Inlet. This project involved a major upgrade to the existing container terminal facility to expand the operating capacity, including both land and marine construction.

Below are some notable projects completed by the three GIG partners individually. More individual projects can be found on their websites.

  • Location: Vancouver, BC
  • Owner: Alliance Grain Terminals Ltd.
  • Completed: September 2017
  • Value: $6.5M

  • Location: Tsawwassen, BC
  • Owner: BC Ferry Services Inc.
  • Completed: September 2020
  • Value: $4.5M

  • Location: Esquimalt, BC
  • Owner: Milestone Environmental
  • Completed: March 2020
  • Value: $6.8M

  • Location: Squamish BC
  • Owner: Squamish Terminals
  • Completed: September 2016
  • Value: $23M

  • Location: Harrison, BC
  • Owner: Bremner Trio Hydro Corporation
  • Completed: Ongoing
  • Value: $100M

  • Location: New Westminster, BC
  • Owner: Translink
  • Completed: January 2017
  • Value: $8.0M

  • Location: Delta, BC
  • Owner: Ministry of Transportation and Infrastructure
  • Completed: May 2008
  • Value: $4.8M

  • Location: Mission, BC
  • Owner: Ministry of Transportation and Infrastructure
  • Completed: April 2012
  • Value: $10.5M

  • Location: North Vancouver, BC
  • Owner: Ministry of Transportation and Infrastructure
  • Completed: May 2015
  • Value: $6.3M

  • Location: 14 KM South of Meziadin Junction on Hwy. #37, BC
  • Owner: Ministry of Transportation and Infrastructure
  • Completed: December 2019
  • Value: $19.2M

  • Location: North Vancouver, BC
  • Owner: Neptune Bulk Terminals
  • Completed: February 2020
  • Value: $414K

  • Location: New Westminster, BC
  • Owner: Translink
  • Completed: January 2017
  • Value: $8.0M

  • Location: Tsawwassen, BC
  • Owner: Ledcor Construction
  • Completed: February 2016
  • Value: $17.5 M

  • Location: Delta-Surrey, BC
  • Owner: Province of BC
  • Completed: December 2013
  • Value: $680M